What's New
The following is a listing of the major additions, changes and enhancements which have been made in Settle3.
For a list of changes and bug fixes since the initial release of Settle3, see the Settle3 Update History page.
Maintenance + (v 5.020)
Maintenance + (v 5.019)
New Features
Maintenance+ (v 5.018)
Maintenance+ (v 5.017)
New Tutorials
- Section creator Tutorial - Additional Exercise
Maintenance+ (v 5.014)
New Tutorials
Maintenance+ (v 5.011)
New Features
New Tutorials
Maintenance+ (v 5.007)
New Features
New Tutorials
- Tutorial 14a - Liquefaction Analysis using CPT data
- Tutorial 20 - Multiple Load Import
- Tutorial 21 - Multiple CPT import
Maintenance+ (v 5.006)
Ground improvement
Embankment Designer
Dry ground settlement
Version 4.0
CPT Analysis
- CPT soil profiling
- CPT file import dialog
- Evaluation of geotechnical parameters
- Incorporation of CPT into soil profile
Updates to Liquefaction Analysis
- Post-triggering LDI and settlement for CPT and VST input
- Pre-defined Triggering methods for SPT-based analysis
New Material Property Definition Options
- Datum dependency for all material properties
- Three different datum-dependency options
- Stage material properties
Modelling of Non-Horizontal Ground Surface
- Define non-horizontal ground surface by specifying different borehole top elevations
Ground Improvement
- Define multiple ground improvement zones
- Staged ground improvement
Horizontal Load Definition
- New load definition options
- Horizontal stress results
New Analysis Results Output
- Horizontal Stresses
- New consolidation settlement display options
- Modulus of Subgrade Reaction