Tutorials Overview
All Tutorials
																																	1 - Quick Start Tutorial
- Applying a Circular Load
 - Immediate Settlement
 - Primary Consolidation Settlement
 - Deformed Contours
 
																																	2 - Time-Dependent Consolidation
- Staging
 - Groundwater
 - Time-Dependent Consolidation
 
																																	3 - Storage Tank on Embankment
- Load Staging
 - Embankments
 - Multiple Materials
 
																																	4 - Wick Drain Tutorial
- Embankments
 - Multiple Materials
 - Consolidation Analysis
 - Wick Drains
 
																																	5 - Excavations
- Staging with Water Table
 - Excavations
 - Reference Stage
 
																																	6 - Preload with Wick Drains
- Pre-Loading
 - Wick Drains
 - Staged Loading
 - Consolidation
 
																																	7 - Preload with Back Analysis
- Pre-Loading
 - Consolidation
 - Relative Settlement
 
																																	8 - Embankment Staging
- Soil Properties
 - Soil Layers
 - Embankment Load
 - Widen Embankment
 
																																	9 - Empirical Methods
- Water Level
 - Add Loads
 - Empirical Settlement Calculation
 
																																	10 - Hydroconsolidation
- Hydroconsolidation Soils
 - Collapsible Soils
 - Swelling
 
																																	11 - Secondary Consolidation
- Staged Loads
 - Time-dependent Consolidation
 - Standard Secondary Consolidation
 - Mesri Secondary Consolidation
 
																																	12 - Liquefaction Analysis
- Liquefaction Input Data
 - Liquefaction Analysis Options
 - Graphing Results
 
																																	13 - Multiple Boreholes
- Multiple Boreholes
 - Multiple Water Level Input
 - Display Options
 
																																	14 - CPT Analysis
- CPT Analysis
 - Data interpretation
 - SBT Plots
 
																																	14a - Liquefaction analysis using CPT data
- CPT analysis
 - Liquefaction analysis with CPT data
 - Data interpretation
 
																																	15 - Horizontal Loading
- Horizontal and Vertical Loading
 - Horizontal Stresses
 
																																	16 - Non-Horizontal Ground Surface
- Non-horizontal Soil Layers
 - Non-horizontal Ground Surface
 - Import surface point cloud data
 
																																	17 - Ground Improvement - Pt 1: Vibro-Compaction
- Embankment Designer
 - Adding Vibo-compaction to a Region
 - Ground Improvement Sensitivity Analysis
 
																																	18 - Ground Improvement - Pt 2: Stone Columns
- Embankment Designer
 - Adding Stone Columns to a Region
 - Ground Improvement Sensitivity Analysis
 
																																	19 - Embankment Cross Section Designer
- Cross Section Embankment Designer
 - Advanced Embankment Staging
 - Non-Horizontal Layering
 
																																	20 - Multiple Load Import
- Multiple load import
 - Modulus of subgrade reaction export
 
																																	21 - Rapid CPT Data Import
- CPT Analysis
 - Multiple CPT Data Import
 - Multiple CPT Data Analysis
 
																																	22 - Section Creator
- Extruded Section Layer
 - Section Creator
 - Boreholes
 
																																	23 - Stone Column Drainage
- Ground Improvement
 - Stone Columns Drainage
 
																																	24 - Import from RSLog
- Import from RSLog
 - Section creator with boreholes from RSLog
 
																																	25 - Ground Improvement – Pt 3: Dynamic Compaction
- Ground Improvement
 - Adding a Dynamic Compaction