Tutorial 17 - Trench with Piles and Struts

In this tutorial, Phase2 is used to simulate the excavation of a trench into a sloped embankment. The trench is supported by soldier piles and struts. The model is built in five stages:

  1. Bring soil layers to equilibrium

  2. Install a pile on the high side of the trench

  3. Excavate the first section of the trench and lower the water table

  4. Install a pile on the low side of the trench and install a strut between the two sides

  5. Excavate the final section of the trench and lower the water table

Trench with Piles and Struts (click to view PDF file of tutorial)