Phase2 Tutorials > Geotextile Reinforced Ramp
In this tutorial, a ramp is constructed and its performance under loading is assessed. The model is created in four stages as follows:
Foundation soil layer is brought to equilibrium.
Fill is added on top of the soil interlayed with geotextile support layers. Precast concrete liners are added to support the fill.
The concrete road bed is constructed on top of the fill.
Load is applied to the road surface.
Geotextile Reinforced Ramp (click to view PDF file of tutorial)
Topics Covered in this Tutorial
Import DXF
Geotextiles
Liners
Structural Interfaces
Selection Windows
Selection Filter
Discretization Density
Mapped meshing
Staged Loading
Liner Bending Moments

Geotextile reinforced ramp model