Tutorial 02 - Materials and Staging

This tutorial demonstrates the use of multiple materials and staging in Phase2. The model represents a longhole stope in an orebody which has different properties than the surrounding rock mass.

The model consists of four stages – the stope is excavated in the first three stages, and is backfilled in the fourth stage. Support (cables) are installed from the access drifts to the hangingwall.

Materials and Staging (click to view PDF file of tutorial)

Topics Covered in this Tutorial

Materials and Staging model