Phase2 Tutorials > Materials and Staging Tutorial
This tutorial demonstrates the use of multiple materials and staging in Phase2. The model represents a longhole stope in an orebody which has different properties than the surrounding rock mass.
The model consists of four stages – the stope is excavated in the first three stages, and is backfilled in the fourth stage. Support (cables) are installed from the access drifts to the hangingwall.
Materials and Staging (click to view PDF file of tutorial)
Topics Covered in this Tutorial
Multiple materials
Staged excavation
Stage boundaries
Import DXF
Cable bolts / plain strand cable
Backfill
Initial element loading
Yielding
Graphing bolt data
Differential results / reference stage
Load step plot / log file

Materials and Staging model