Graph Liner Data

To graph liner data:

  1. Select Graph Liner Data from the toolbar or the Graph menu. You will first be prompted to pick the liner(s) to graph.

  2. Liners are selected indirectly, by selecting the boundary entity that they are lining (i.e. excavation, stage, material, or external boundaries). You can select the desired boundaries individually with the left mouse button, or with a selection window, or by using Select All in the right-click menu to select all liners.

  3. When you are finished selecting, press Enter, or right-click and select Graph Selected from the popup menu.

  4. You will then see the Graph Liner Data dialog, which allows you to select the data type to plot, as well as plotting data from multiple stages on the same plot. You can also choose whether to colour-code the lines according to the liner type (if you are plotting different liner types on the same graph), or according to the stage (if you are plotting data from multiple stages).

  5. When you have made the desired selections in this dialog, select Create Plot and the graph will be generated in Phase2. Alternatively, data may be plotted in Excel or copied to the clipboard, by selecting the Plot in Excel or Copy Data buttons. See the Plot in Excel and Copy Data topics for details.

Liner Data Graphs

Note the following about the Liner Data graphs in Phase2:

Tips